8d报告范文(中英文)下载篇一
新8D报告中英文版{8d报告范文(中英文)下载}.
又名:客诉改善行动要求单(CAR)& 纠正预防措施整改报告 编号Doc No:WF/QC-30
Page 1 of 2{8d报告范文(中英文)下载}.{8d报告范文(中英文)下载}.
又名:客诉改善行动要求单(CAR)& 纠正预防措施整改报告 编号Doc No:WF/QC-30
本8D报告格式设计:zhangli Page 2 of 2 NO.:
8d报告范文(中英文)下载篇二
8D报告模板(中英文)
![{8d报告范文(中英文)下载}.](http://img.zyfsgs.com/uploadfile/2017/0310/20170310012105485.png)
8d报告范文(中英文)下载篇三
8D报告模板(中英文)
8d报告范文(中英文)下载篇四
8D报告模板 英文版{8d报告范文(中英文)下载}.
8D REPORT
8D Number: Issued To: I Defect Description: (D1) Select a team and Scope Project:
Phase Completion Date:
Date Issued:
Date Of Completion:
PN: Defect DC and Quantity :
(D2) Define & Describe the Problem:
Estimation of consequences: Other plants affected: Attachments: Phase Completion Date:
(D3) Containment (Immediate actions required to eliminate defects at supplier, mfg., and customer, & maintain production):
Phase Completion Date:
(D4) Identify Root Cause (Define & Verify root cause):
Failure Mechanism Description(by 5why analysis ):
Reason of non detection in tests(by 5why analysis):
Identify Root Cause:
Phase Completion Date:
(D5) Permanent Corrective Action:
The following permanent corrective actions have been decided: Permanent Corrective Action Action By Status
Phase Completion Date:
Pagina 1 din 2
(D6) Verification of Corrective Action: Method of Verification: Verification Evidence: Phase Completion Date: (D7) Prevention: (Preventive action taken, to see this does not occur again) FMEA update: Control Plan updated: Other: Phase Completion Date: Date: Date: Date: (D8) Recognize Team Success: (Acknowledge Team and communicate results) Phase Completion Date: To Be Completed By Quality Assurance Corrective action evaluation: Accept Review Signature_____________ Reject Date_____________ Date/Time of Report Generation: Pagina 2 din 2
8d报告范文(中英文)下载篇五
8D报告(中英文)