8d报告范文英文
来源:热门资讯 发布时间:2012-12-30 点击:
8d报告范文英文篇一
8D报告模板 英文版
8D REPORT 8D Number: Issued To: I Defect Description: (D1) Select a team and Scope Project: Phase Completion Date: Date Issued: Date Of Completion: PN: Defect DC and Quantity : (D2) Define & Describe the Problem: Estimation of consequences: Other plants affected: Attachments: Phase Completion Date: (D3) Containment (Immediate actions required to eliminate defects at supplier, mfg., and customer, & maintain production): Phase Completion Date: (D4) Identify Root Cause (Define & Verify root cause): Failure Mechanism Description(by 5why analysis ): Reason of non detection in tests(by 5why analysis): Identify Root Cause: Phase Completion Date: (D5) Permanent Corrective Action: The following permanent corrective actions have been decided: Permanent Corrective Action Action By Status Phase Completion Date: Pagina 1 din 2
(D6) Verification of Corrective Action: Method of Verification: Verification Evidence: Phase Completion Date: (D7) Prevention: (Preventive action taken, to see this does not occur again) FMEA update: Control Plan updated: Other: Phase Completion Date: Date: Date: Date: (D8) Recognize Team Success: (Acknowledge Team and communicate results) Phase Completion Date: To Be Completed By Quality Assurance Corrective action evaluation: Accept Review Signature_____________ Reject Date_____________ Date/Time of Report Generation: Pagina 2 din 2
8d报告范文英文篇二
8D报告英文版格式{8d报告范文英文}.
8d报告范文英文篇三
8D报告-英文{8d报告范文英文}.
Page 1 of 6
Page 2 of 6
Page 3 of 6
Page 4 of 6
Page 5 of 6
8d报告范文英文篇四
8D报告模板(中英文)
8d报告范文英文篇五
英文8D报告
8D Corrective Action Report
Date of Complaint:
Date samples received at factory: Type of Complaint: Customer Reference #: Supplier Reference #: Silicon Labs CAPA #:

Silicon Labs RMA # / QI #:
Customer Name: Supplier Name:
Customer Part #: Silicon Labs Part #: Package:
Batch #(s): Tracecode(s):
23-Mar-16 NA
Supplier NA
2451 NA{8d报告范文英文}.
Ryder{8d报告范文英文}.{8d报告范文英文}.
* Start date:23-Mar-16 * Completion date: 23-Mar-16
* Summary of results: Check and confirm risk batch on Ryder site 3.1

To check the risk batch Qtyfor this quality issue Resp: Yuan Fu Ping Due: 23-Mar-16 Status: Completed
The affected batch of modules is ETRX-357-LRS
QTY: 27000
Lot number: 78
Reel label :004831-004875 PO:6000206962
3.2 Resp: Yuan Fu Ping Due: 23-Mar-16 Status: In progress passed function inspection test * …
Solder paste thickness record as refer to Specification linechart and CPK as below shown No any Skyworks IC rework record on our test record